Sign in Subscribe

Green River Road resurfacing project funded with chapter 90 money

Select Board · Meeting of March 10, 2025

Alford Select Board discusses Green River Road resurfacing with culvert replacement project. Highway Superintendent TJ Horrigan reported plans to resurface Green River Road from Rowe Road to Crooked Hill Road using $283,000 in accumulated chapter 90 highway funds over the past two years. The project includes six culvert replacements before paving, with Highway Department funds covering replacement work and line painting.

The West Road Bridge project remains on schedule, with concrete poured this week, and the board addressed a dangerous dog complaint that will require Town Counsel consultation and a public hearing, with select board member Charles Ketchen recusing himself.

In the full story:

  • The complete report — 248 words

Source: the Select Board meeting of March 10, 2025, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Alford News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Alford News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe